Buying guide · Sampling and approval

Sampling and Approval for Custom Sportswear

A sample is the only point in the whole order where a mistake is still cheap. After approval, everything that was agreed becomes the specification the production run is measured against — including the things nobody meant to agree to. That is why the useful question is not “is this good enough” but “is this exactly what I want repeated three hundred times”.

5–7 daysSampling once fabric and artwork are confirmed
1 pcMinimum for a sample — no volume needed to test
15 daysProduction to dispatch, counted from approval

01 · What a sample is for

Three jobs, often confused

Buyers and factories use the word “sample” for three different objects, and a lot of disagreement comes from not saying which one is being discussed. They answer different questions and they are judged by different standards.

Fit sample

Answers: does this pattern work on a body? Judged on measurements, drape and where the seams land — not on colour accuracy or print quality.

Pre-production sample

Answers: is this exactly what will be made? Judged on everything — fabric, colour, decoration, labels, trims. This is the one that becomes the reference.

Sales sample

Answers: can this be sold? Judged on presentation. Often made before the final fabric is locked, which is why it should never be treated as an approval.

Approving a sales sample as if it were a pre-production sample is one of the most common causes of a disputed delivery — the buyer approved a garment that was never intended to be the production specification.

What gets tested also depends on who is ordering: a club tests a full size set across a squad (team and club kits), while a company tests one logo placement across several garment types (corporate teamwear).

02 · The sign-off checklist

What to check before saying yes

An approval is a list of decisions, not a feeling. These are the six that get revisited most often when a production run is questioned later.

Item What to check How to check it
Measurements Key points against the agreed size chart, at the size you will sell most of Tape measure on a flat garment, not on a hanger
Fit on a body Where the hem sits, whether the armhole pulls, how it behaves in motion Worn by someone in the target size, moving — not standing still
Fabric hand Whether the weight and surface match the brief Compare against the swatch you approved, in daylight
Colour Against the reference, on the actual fabric Same light source for reference and sample; not a screen
Decoration Placement, size, colour count, edge quality Measure the placement; look at the edge at reading distance
Labels and trims Neck label position, care label content, tag attachment As the garment will actually ship, not loose in a bag

Two of these decide most disputes: measurements taken on a hanger, and colour judged on a screen. Both are avoidable by checking the way the garment will be judged later.

03 · Giving feedback

A vague comment costs a round

The most expensive sentence in sampling is “it feels a bit off”. It cannot be acted on, so the factory guesses, and the next round tests the guess instead of the fix. Specific comments get fixed on the first attempt.

Vague: “The shorts feel too long and the print looks small.”
Actionable: “Inseam measures 6cm longer than the size chart. Shorten to the chart. Logo prints 7cm wide; spec says 9cm — reprint at 9cm.”

Three habits make feedback usable: name the measurement, state the target, and separate what must change from what is a preference. A factory can hold a preference in mind; it cannot guess which of five comments is the blocking one.

  • One list, numbered. Split comments across three emails and one of them gets missed.
  • Mark severity. Blocking, should-fix, nice-to-have — stated explicitly.
  • Attach the evidence. A photo with a tape measure in frame removes an argument later.
  • Say what is approved. Silence on an item is not approval; it reads as unresolved.

04 · Rejections

Why samples actually get rejected

Cause What it looks like Whose decision it was
Brief was ambiguous Garment is correct to the written spec, wrong to the intent Shared — the spec did not capture the intent
Substituted fabric Weight or hand is close but not the approved swatch Factory, unless the substitution was agreed in writing
Colour drift Shade reads different under the buyer’s light Shared — reference and light source were not fixed
Decoration out of position Print or embroidery sits a centimetre from where it was specified Factory — placement is measurable
Expectation changed The sample is right, but the buyer now wants something else Buyer — and it is a new brief, not a correction

The last row is worth naming honestly. Changing direction after seeing a sample is legitimate, but it is a scope change, and treating it as a defect to be fixed for free usually ends in a worse relationship than saying so.

05 · After approval

What the approval actually locks

Approval converts a sample into a specification. From that point, the production run is measured against it — not against the conversation that preceded it. That has consequences worth understanding before signing.

  • Every visible detail becomes the standard. If the sample had a slightly higher collar than intended and it was approved, the run will match the collar.
  • The record is what enables a reorder. Fabric, colour reference, decoration placement and construction are what make a second order a repeat rather than a project.
  • A silent acceptance is still an acceptance. Approving by not replying, or by moving straight to production, transfers the risk to the buyer.

What the record should contain: the tech pack a factory can quote from

06 · Position in the order

Where sampling sits in the timeline

Stage Duration What can still change
Specification and artwork Before sampling starts Everything — this is the cheapest place to be wrong
Sampling 5–7 days Fabric, fit, decoration, labels
Review and feedback Days, decided by the buyer Anything, at the cost of a further round
Production 15 days to dispatch Very little — changes here are rework

The variable that most often moves a delivery date is not the 5–7 days of sampling or the 15 days of production. It is the review, which sits outside the factory’s control and can run for weeks if the comments are not specific enough to act on.

Cost mechanics behind a small first run: minimum order quantity and tier pricing

07 · Questions

What buyers ask about sampling

How many sampling rounds should I expect?

One is normal when the brief is specific and the feedback is measurable. A second round usually means either a substitution that was not agreed or comments that could not be acted on precisely. A third is usually a sign the brief is still moving.

Can I approve a sample I have only seen in photographs?

Not reliably. Photographs communicate colour and shape but not weight, hand-feel or how a seam sits on a body — and those are the things most often rejected later. If distance makes a physical sample impractical, ask for specific measured points and a video of the garment being worn and moved.

What happens if I approve and then want a change?

Before production starts, it is a specification change and usually costs a new sample. After the run has begun, it is rework and the cost is higher. This is why the review stage is worth taking time over — it is the last point where a change is cheap.

Do I need a sample for a reorder?

Not if the specification was recorded and nothing has changed. A reorder reproduces the approved record — same fabric, same colour reference, same decoration placement. A new sample is only needed when one of those changes.

Who keeps the approved sample?

Both sides should. The factory keeps it as the production reference; the buyer keeps it as the standard for what was agreed. When a delivery is questioned, the approved sample is the only object that settles the question without argument.