For companies, staff teams and corporate events

Corporate Teamwear and Staff Sports Kits

A company order looks like a club order and behaves nothing like one. There is no squad list, the sizes arrive late from people who have never ordered apparel, the logo comes from a marketing folder with rules attached, and the deadline is usually a single event day. What decides whether it works is not the garment — it is how the sizes, the logo and the reorder are handled.

5–7 daysSampling with your logo in position
15 daysProduction to dispatch after approval
1 pcMinimum order — including single replacements later

01 · Why it differs

A staff order is not a smaller club order

The difference is not quantity. It is who supplies the information and how much of it is unknowable at order time. A club knows its members; a company knows its headcount but not the size distribution, and the people who will wear the kit are not the people placing the order.

What the company asks for What a standard order assumes What we do
“About 120 people, sizes to follow” A fixed size breakdown at quote stage Quoted on headcount, with a size set confirmed before cutting
One identity across tees, polos and jackets Each style decorated independently One colour reference and one logo placement rule applied across all styles
A logo with brand guidelines attached Any supplied image is treated as print-ready Artwork checked for minimum size and clear space before sampling
Replacements after the event Reorder means a new minimum run Repeatable at one piece, from the recorded specification

Most corporate orders that go wrong do so at the third row: a logo that reads perfectly on a slide deck turns out to be unusable at the size a chest print requires.

02 · Sizes

Collecting sizes from people who will not answer an email

This is the single biggest cause of delay in a corporate order, and it is administrative rather than technical. Three approaches work, and they can be combined.

A sample set

Send one garment in each size for the office to try on. Slower to start, but it removes the guessing that produces a box of unworn mediums.

A single declaration

One form, one deadline, one reminder. Sizes collected across two weeks of individual replies produce a breakdown nobody can act on.

A spare allowance

Agree a stated number of spares in the middle sizes at quote stage, rather than discovering the gap after the event.

Whatever the method, the number that matters is not the total — it is the split. A hundred pieces across one size and a hundred across eight are different production jobs, and only the second one needs a size set confirmed before cutting.

The method in detail: how team orders are built as size sets

03 · One identity

Keeping the logo in the same place on every garment

A corporate kit usually spans three or four garment types, and each one puts the logo on a different surface: a piqué polo, a jersey tee, a woven jacket, a softshell. The logo has to land in the same relative position on all of them or the kit stops reading as one kit.

  • Fix the placement rule, not just the position. “Centred on the left chest, aligned to the placket” survives a change of garment; “80mm from the shoulder” does not.
  • One colour reference across all styles. The same reference on different fabric bases will read slightly differently — that is expected, and it is checked on physical swatches rather than assumed.
  • Decide sleeve and back treatment once. Adding a back print later, after the front is approved, is a second sampling round.

The pieces that usually make up a staff kit: polos for front-of-house and events, sports shirts for team days, and jackets for travel and presentation. Each carries the same mark in the same rule.

Method choice per garment: which decoration suits which fabric

04 · Logos

Four logo files that cannot be produced as supplied

Brand guidelines exist for a reason, and they usually specify a minimum size and a clear space around the mark. Production has its own limits, and the two do not always agree.

What arrives Why it fails What is needed
A JPEG lifted from the website No transparency, edges already compressed Vector file, or a high-resolution original with transparency
A logo with a fine tagline underneath The text closes up below a certain print size A version without the tagline for small placements
A full-colour mark for embroidery Gradients and thin strokes cannot be stitched A one-colour or simplified version for stitch
A mark with a tight clear space Print and stitch need a margin to hold the edge Confirmation of the smallest size the brand will accept

None of these is a design problem — they are specification mismatches, and all four are resolved before the sample rather than after the production run.

05 · Reorders

The order after the order

A corporate kit is never really finished. People join, sizes change, one jacket is lost at an event. What makes that manageable is whether the first order left a record behind: the fabric, the colour reference, the logo file at the right size, and the decoration method.

  • Replacements at one piece. A single garment can be produced later from the recorded specification, which is why the minimum order matters beyond the first purchase.
  • The same logo file, not a new one. Each department that re-sends artwork is a chance for the mark to drift.
  • Specification on file, not in an email thread. The record is what makes a second order a repeat rather than a project.

Why the record is written at sampling: what a tech pack captures, and how a first run becomes a reorder

06 · Timeline

Working back from a fixed event date

When What has to happen Who
7 weeks out Garment types, quantities and logo files confirmed Company
6 weeks out Size declaration issued internally, deadline agreed Company
5 weeks out Sample produced with logo in position Us — 5–7 days
4 weeks out Fit, colour and logo placement signed off Company + us
4 to 2 weeks out Production and inspection Us — 15 days
2 weeks out Dispatch, then shipping by the agreed method Both

The step that slips is almost always the size declaration, not production. Setting its deadline six weeks out leaves room for a second chase without moving the event.

07 · Questions

What companies ask before ordering

Can we order without knowing the final size breakdown?

Yes for the quotation — it can be built on headcount and garment type. Cutting needs the split, because a hundred pieces across eight sizes is a different production job from a hundred in one size. A sample set or a single declaration form is the usual way to get there.

Can we mix polos, tees and jackets in one order?

Yes, and that is the normal shape of a corporate kit. All styles are quoted together so the company sees one number, and one logo placement rule is applied across every garment so the kit reads as a set rather than as separate purchases.

Our logo has strict brand guidelines — can you work to them?

Yes, provided the guidelines are shared with the order. Minimum size and clear space are checked against the placement before sampling, because a mark that is compliant on a document can still be unproducible at the size a chest print requires.

Can we reorder single pieces later for new staff?

Yes. One piece is the minimum order, and a replacement is produced from the specification recorded at the first order — same fabric, same colour reference, same logo file. That is the practical reason to keep the record rather than rely on the original email thread.

How far ahead should we plan for an event?

About seven weeks is a comfortable window: one week to confirm garments and artwork, one week to collect sizes, 5–7 days for the sample, a few days for sign-off, then 15 days to dispatch. Tight deadlines are possible, but they remove the room for a fix.

Send the logo and the headcount, get a real quote

Tell us the garment types, roughly how many people and the date you need them. You will get a quotation covering each style, the decoration and a dispatch date — plus the size-collection step written into the timeline so it does not become the delay.

Request a quote