No products in the cart.
Buying guide · Sampling and approval
Sampling and Approval for Custom Sportswear
A sample is the only point in the whole order where a mistake is still cheap. After approval, everything that was agreed becomes the specification the production run is measured against — including the things nobody meant to agree to. That is why the useful question is not “is this good enough” but “is this exactly what I want repeated three hundred times”.
01 · What a sample is for
Three jobs, often confused
Buyers and factories use the word “sample” for three different objects, and a lot of disagreement comes from not saying which one is being discussed. They answer different questions and they are judged by different standards.
Fit sample
Answers: does this pattern work on a body? Judged on measurements, drape and where the seams land — not on colour accuracy or print quality.
Pre-production sample
Answers: is this exactly what will be made? Judged on everything — fabric, colour, decoration, labels, trims. This is the one that becomes the reference.
Sales sample
Answers: can this be sold? Judged on presentation. Often made before the final fabric is locked, which is why it should never be treated as an approval.
Approving a sales sample as if it were a pre-production sample is one of the most common causes of a disputed delivery — the buyer approved a garment that was never intended to be the production specification.
What gets tested also depends on who is ordering: a club tests a full size set across a squad (team and club kits), while a company tests one logo placement across several garment types (corporate teamwear).
02 · The sign-off checklist
What to check before saying yes
An approval is a list of decisions, not a feeling. These are the six that get revisited most often when a production run is questioned later.
| Item | What to check | How to check it |
|---|---|---|
| Measurements | Key points against the agreed size chart, at the size you will sell most of | Tape measure on a flat garment, not on a hanger |
| Fit on a body | Where the hem sits, whether the armhole pulls, how it behaves in motion | Worn by someone in the target size, moving — not standing still |
| Fabric hand | Whether the weight and surface match the brief | Compare against the swatch you approved, in daylight |
| Colour | Against the reference, on the actual fabric | Same light source for reference and sample; not a screen |
| Decoration | Placement, size, colour count, edge quality | Measure the placement; look at the edge at reading distance |
| Labels and trims | Neck label position, care label content, tag attachment | As the garment will actually ship, not loose in a bag |
Two of these decide most disputes: measurements taken on a hanger, and colour judged on a screen. Both are avoidable by checking the way the garment will be judged later.
03 · Giving feedback
A vague comment costs a round
The most expensive sentence in sampling is “it feels a bit off”. It cannot be acted on, so the factory guesses, and the next round tests the guess instead of the fix. Specific comments get fixed on the first attempt.
Three habits make feedback usable: name the measurement, state the target, and separate what must change from what is a preference. A factory can hold a preference in mind; it cannot guess which of five comments is the blocking one.
- One list, numbered. Split comments across three emails and one of them gets missed.
- Mark severity. Blocking, should-fix, nice-to-have — stated explicitly.
- Attach the evidence. A photo with a tape measure in frame removes an argument later.
- Say what is approved. Silence on an item is not approval; it reads as unresolved.
04 · Rejections
Why samples actually get rejected
| Cause | What it looks like | Whose decision it was |
|---|---|---|
| Brief was ambiguous | Garment is correct to the written spec, wrong to the intent | Shared — the spec did not capture the intent |
| Substituted fabric | Weight or hand is close but not the approved swatch | Factory, unless the substitution was agreed in writing |
| Colour drift | Shade reads different under the buyer’s light | Shared — reference and light source were not fixed |
| Decoration out of position | Print or embroidery sits a centimetre from where it was specified | Factory — placement is measurable |
| Expectation changed | The sample is right, but the buyer now wants something else | Buyer — and it is a new brief, not a correction |
The last row is worth naming honestly. Changing direction after seeing a sample is legitimate, but it is a scope change, and treating it as a defect to be fixed for free usually ends in a worse relationship than saying so.
05 · After approval
What the approval actually locks
Approval converts a sample into a specification. From that point, the production run is measured against it — not against the conversation that preceded it. That has consequences worth understanding before signing.
- Every visible detail becomes the standard. If the sample had a slightly higher collar than intended and it was approved, the run will match the collar.
- The record is what enables a reorder. Fabric, colour reference, decoration placement and construction are what make a second order a repeat rather than a project.
- A silent acceptance is still an acceptance. Approving by not replying, or by moving straight to production, transfers the risk to the buyer.
What the record should contain: the tech pack a factory can quote from
06 · Position in the order
Where sampling sits in the timeline
| Stage | Duration | What can still change |
|---|---|---|
| Specification and artwork | Before sampling starts | Everything — this is the cheapest place to be wrong |
| Sampling | 5–7 days | Fabric, fit, decoration, labels |
| Review and feedback | Days, decided by the buyer | Anything, at the cost of a further round |
| Production | 15 days to dispatch | Very little — changes here are rework |
The variable that most often moves a delivery date is not the 5–7 days of sampling or the 15 days of production. It is the review, which sits outside the factory’s control and can run for weeks if the comments are not specific enough to act on.
Cost mechanics behind a small first run: minimum order quantity and tier pricing
07 · Questions
What buyers ask about sampling
How many sampling rounds should I expect?
One is normal when the brief is specific and the feedback is measurable. A second round usually means either a substitution that was not agreed or comments that could not be acted on precisely. A third is usually a sign the brief is still moving.
Can I approve a sample I have only seen in photographs?
Not reliably. Photographs communicate colour and shape but not weight, hand-feel or how a seam sits on a body — and those are the things most often rejected later. If distance makes a physical sample impractical, ask for specific measured points and a video of the garment being worn and moved.
What happens if I approve and then want a change?
Before production starts, it is a specification change and usually costs a new sample. After the run has begun, it is rework and the cost is higher. This is why the review stage is worth taking time over — it is the last point where a change is cheap.
Do I need a sample for a reorder?
Not if the specification was recorded and nothing has changed. A reorder reproduces the approved record — same fabric, same colour reference, same decoration placement. A new sample is only needed when one of those changes.
Who keeps the approved sample?
Both sides should. The factory keeps it as the production reference; the buyer keeps it as the standard for what was agreed. When a delivery is questioned, the approved sample is the only object that settles the question without argument.
Send the spec, get a sample you can approve properly
Send the garment, the size chart and the artwork, and you will get a sample assembled the way production will assemble it — labels in place, decoration in position — together with the measured points, so approval is a decision rather than an impression.



